Summary of Contents for Pytes E-BOX Series

  • Page 1 Installation and configuration manual With selectronic Pytes Lithium Battery E-BOX series With selectronic Inverter...
  • Page 2: Table Of Contents

    CONTENTS BOM LIST ..................3 HOW TO INSATLL ..............5 1. Power Cable Connection ............5 Step.1 ....................6 Step.2 ....................7 Step.3 ....................7 2. Communication Cable Connection ........8 3. Set The DIP Switch ...............9 4. Start up the system ...............9 5.Change the battery setting of the inverter ......10 Step1.
  • Page 3: Bom List

    BOM LIST Before installation, you should prepare following items. Item Remarks Quantity ☐ Conductor cross-section: 50 mm² to 95 mm² ☐ Cable diameters: 14 mm to 25 mm Depends on the number of ☐ Only copper cables may be used. Power Cable batteries and the ☐...
  • Page 4 Definition of RJ45 Port Pin for BMS is as follow. Click here to tell the version of 48100R you have. CAN port definition Version of 48100R Pin number of com. cable B and C version...
  • Page 5: How To Insatll

    HOW TO INSATLL communication cable Power cable connection connection Start up the system Set the DIP switch change the battery Check the battery soc setting of the inverter System monitoring CAUTION: If you want to get more inverter-related settings, please refer to the inverter user manual first.
  • Page 6: Power Cable Connection

    1. Power Cable Connection Step.1 Open the front housing of the selectronic inverter.
  • Page 7: Step.2

    Step.2 Connect the red and black cables to the inverter DC connector as shown in Pic .1.1.1 Pic 1.1.1 Step.3 At the other end of the cable, connect to the battery as shown Pic 1.1.2.(Ensure that the battery power switch is off) Pic 1.1.2...
  • Page 8: Communication Cable Connection

    2. Communication Cable Connection Connect the end of the cable to the inverter communication port as shown in pic 1.2.1. Make sure which communication port to use. Pic 1.2.1 Connect the other end of the cable to the battery communication port as shown in pic 1.2.1.
  • Page 9: Set The Dip Switch

    Pic 1.2.2 3. Set The DIP Switch Set the DIP switch as shown in Pic 1.2.3. Version of 48100R ADD setting A and B version C version Pic 1.2.3 4. Start up the system Restore the cover plate of the inverter,Start up the inverters and batteries.
  • Page 10: Change The Battery Setting Of The Inverter

    ① ② 5.Change the battery setting of the inverter ※ CAUTION:If you want more details about the batteries settings , please check the operating manual of inverters. Step1. Connect the host computer cable from the inverter to the laptop. Pic 1.5.1...
  • Page 11: Step2

    Pic 1.5.2 Step2. Go to selectronic https://www.selectronic.com.au/splink/and download the SP LINK. Pic 1.5.3...
  • Page 12: Step 3

    Pic 1.5.3 Step 3. Connect and select the protocol. Pic 1.5.4...
  • Page 13: Step 4

    Pic 1.5.5 Step 4. Set the parameters of the battery on the inverter. Please check the battery E-BOX 48100R user manual for detailed parameters...
  • Page 14: Check The Battery Data On Inverter

    6.Check the battery data on inverter Step.1 Touch the Quick View can see the battery data. Pic 1.6.1 Step.2 Click the Data View can see detail datas. Pic 1.6.2...
  • Page 15 -END-...