Pytes E-Box Series User Manual page 31

Table of Contents

Advertisement

Fix the base components on the wall with 10 expansion bolts.
Insert the bottom board into the base components.
When drilling holes, avoid the water pipes and power cables buried in the wall.
Step 2 Assemble the main body.
Fix the bracket on the wall with 5 expansion bolts.
Put the batteries on the base components.
Shanghai Pytes Energy Co., Ltd

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E-Box Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

E-box 48100r

Table of Contents