Table 4.12 Acoustic Stack Assembly for a 15 kHz System
Step
3
4
5
6
4.8.2
For a 20 kHz System
Table 4.13 Acoustic Stack Assembly for a 20 kHz System
Step
1
2
3
4
5
6
4.8.3
For a 30 kHz System
Table 4.14 Acoustic Stack Assembly for a 30 kHz System
Step
1
2
1019571 REV. 03
Install the threaded stud into the top of the horn. Torque to 450 in-lbs,
50.84 Nm. If the stud is dry, apply 1 or 2 drops of a light lubricating oil
before installing.
Install a single Mylar washer (matching the size of the washer to the stud) to
each interface.
Assemble the converter to the booster and the booster to the horn.
Torque to 250 in-lbs, 28.25 Nm.
Clean the mating surfaces of the converter, booster, and horn. Remove any
foreign material from the threaded holes.
Install the threaded stud into the top of the booster. Torque to 450 in-lbs,
50.84 Nm. If the stud is dry, apply 1 or 2 drops of a light lubricating oil
before installing.
Install the threaded stud into the top of the horn. Torque to 450 in-lbs,
50.84 Nm. If the stud is dry, apply 1 or 2 drops of a light lubricating oil
before installing.
Install a single Mylar washer (matching the size of the washer to the stud) to
each interface.
Assemble the converter to the booster and the booster to the horn.
Torque to 220 in-lbs, 24.85 Nm. (Torque 20 kHz Solid Mount Converter to
250 in-lbs, 28.25 Nm).
Clean the mating surfaces of the converter, booster, and horn. Remove any
foreign material from the threaded holes.
Apply a drop of Loctite®
the booster and horn
Action
Action
Action
a
threadlocker 290 (or equivalent) to the studs for
69