Determining the Order
of the Components in
the Rack
Figure 25 Component Rack
Order (Maximum
Configuration)
28
Depending on the upgrade, you may need to install 1–3 Expansion modules
(JBODs) in the rack (see
Expansion modules, see the following sections:
1
Determining the Order of the Components in the Rack
2
Locating the Mounting Position
3
Installing the DXi4700 Expansion Module
To make it easier to correctly cable the system, and for safety reasons, follow
these recommendations when installing the DXi4700 system in the rack:
• When installing components, start with the lowest Expansion module in the
configuration, and then proceed upward in the rack as you add additional
components (see
Figure
• Make sure to leave enough space below the lowest installed component for
future system expansion. The DXi4700 can be expanded to a maximum
configuration requiring 8U of rack space (see
Capacity Upgrade Overview
25).
Node
JBOD 1
JBOD 2
JBOD 3
on page 6). To install the
Table
1)
Installing Expansion Modules

Advertisement

Table of Contents
loading

Table of Contents