Figure 176. M.2 drive cable routing
M.2 PCIe connector
1
After this task is completed
Proceed to complete the parts replacement (see
Demo video
Watch the procedure on YouTube
Complete the parts replacement
Go through this checklist before completing parts replacement.
To complete parts replacement, go through the following list:
1. Ensure that all the removed components have been properly reinstalled and that no tools or loose
screws are left inside your server.
2. Properly route and secure the cables in the server. Refer to the cable connecting and routing information
for each component.
3. Make sure to install one of the following:
ThinkSystem SR860 V2 Maintenance Manual
282
M.2 backplane power connector
2
"Complete the parts replacement" on page
282).