6
Finishing the Installation
A: Place the Unit in the bypass position.
B: Locate the nearest faucet and remove the faucet screen (aerator) if there is any.
C: Turn on the cold water at the faucet.
D: Slowly turn on the main water supply to the system.
E: Let the water run for 5 minutes or until the system is free of any air or foreign materials.
F: Make sure there are no leaks in the plumbing system before proceeding. Shut off the sink
tap when the water runs clear.
IMPORTANT!
!
The system is not ready for service until you complete the Valve Programing
section in the following pages.
BYPASS
POSITION
www.proaquawater.com
System Installation
SERVICE
POSITION
15