Ignition Installation - Seagull Models YAK 54 Assembly Manual

Arf 20cc
Hide thumbs Also See for YAK 54:
Table of Contents

Advertisement

5.
Reinstall the servo horn by sliding the
connector over the pushrod wire. Center
the throttle stick and trim and install the
servo horn perpendicular to the servo
center line.
6.
Move the throttle stick to the closed po-
sition and move the carburetor to closed.
Use a 2.5mm hex wrench to tighten the
screw that secures the throttle pushrod
wire. Make sure to use threadlock on the
screw so it does not vibrate loose.
7.

IGNITION INSTALLATION

I hread nylon tie through mounting
holes.
1.
2.
Connect ignition module to pickup line of
engine. Secure with Safety Clip, safety wire,
tape or other method. Ensure the plugs
will not come apart from vibration or light
tension.
Secure ignition wire with nylon ties as
necessary.
3.
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sea 387

Table of Contents