Lifting Points; Boiler Fixing - Riello DB16 LSM C13 Installation, Use And Maintenance Instructions

Dual fuel light oil/gas burner, two stage progressive or modulating operation
Table of Contents

Advertisement

Available languages

Available languages

4.7

Lifting points

Prepare a suitable lifting system using the rings
shown in Fig. 14.
4.8

Boiler fixing

Fig. 15 shows how to apply the burner to a boiler with a head-
piece that is not cooled.
It is recommended that the head protrusion should not exceed
200 mm. However, the refractory wall must not extend beyond
the end of the combustion head of the burner.
mm
DB16 LSM C13
20155221
Installation
MIN
MAX
340
540
Tab. H
16
20156083
The seal between burner and boiler must be
airtight.
WARNING
5 4 0
GB
Fig. 14
20156086
Fig. 15

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

20154863

Table of Contents