4.4
Operating position
The burner is designed to work only in posi-
tions 1, 2, 3 and 4 (Fig. 11).
The installation 4 permits the operation, but
makes the maintenance and inspection oper-
WARNING
ations of the combustion head more difficult.
1
4.5
Lifting points
Prepare an adequate lifting system.
To move the burner, only use the attachment
points A shown in Fig. 12.
4.6
Installation of the support for burner opening
To install the support for the burner opening proceed as indicated
in Fig. 13:
remove the split pin 2) and the pin from its site.
Insert the support for the burner opening 3) in its casing 4)
until the hole on the support 3) matches the pin 1).
Insert the pin 1) again and the split pin 2) in its seat so as to
lock the support 3).
Installation
2
3
17
GB
To the burner in position 5, direct the pilot gas
train 17)(Fig. 6 a pag. 11) as indicated in
position 1. In order to carry out this operation,
disassemble the pilot gas train and install it
DANGER
upside down.
4
20188930
20188935
20188944
5
Fig. 11
Fig. 12
Fig. 13
20188797