Attaching Backbone Stiffeners - ETC Vortek NXT Installation And Operation Manual

Hoist
Hide thumbs Also See for Vortek NXT:
Table of Contents

Advertisement

Motor
End
Motor Brake

Attaching Backbone Stiffeners

All Vortek NXT hoist installations require the use of aluminum backbone stiffeners installed on top of
the hoist backbone with two 3/8" threaded rods, four nuts and two steel backbone clamps.
Note:
Assemble the backbone stiffener and hardware kit to the hoist as follows:
1:
Turn the backbone stiffener on edge with the chamfered corner down and towards the beam
clamps, then slide it under the center lip of the backbone.
2:
Repeat this process for the opposing side.
3:
Insert the threaded rod through the beam clamp while threading the nut onto the lead end.
4:
Continue pushing the rod into the hole on the backbone stiffener and start threading the second
nut onto the lead end; the threaded rod will run into and through the second beam clamp.
12
Motor Support Frame
Motor
Gearbox
Vortek
Load Brake
If there is something that obstructs you from using backbone stiffeners, you have the
option to use a third set of beam clamps. For additional information, contact your
ETC representative.
Sheaves
Tail Support Frame
Drum
Vortek NXT Hoist Installation Manual
Tail
End

Advertisement

Table of Contents
loading

Table of Contents