Goodwe ABD Series Quick Installation Manual

Goodwe ABD Series Quick Installation Manual

Automatic backup device/multi-inverter parallel device

Advertisement

Quick Installation Guide
Automatic Backup Device
ABD Series
(ABD200-40-US10
|
ABD200-63-US10
|
ABD100-40-US10
|
ABD100-63-US10)
Multi-inverter Parallel Device
MPD Series
(MPD200-40-US10
|
MPD200-63-US10)
V1.0-2022-05-30

Advertisement

Table of Contents
loading

Summary of Contents for Goodwe ABD Series

  • Page 1 Quick Installation Guide Automatic Backup Device ABD Series (ABD200-40-US10 ABD200-63-US10 ABD100-40-US10 ABD100-63-US10) Multi-inverter Parallel Device MPD Series (MPD200-40-US10 MPD200-63-US10) V1.0-2022-05-30...
  • Page 2: Important Safety Instructions

    • Strictly follow the installation, operation, and configuration instructions in this manual. The manufacturer shall not be liable for device damage or personal injury if you do not follow the instructions. Visit https://en.goodwe.com to get more information about product warranty.
  • Page 3: Device Safety

    1.3 Device Safety WARNING The voltage and frequency at the connecting point should meet the on-grid requirements. Make sure that the current rating of this product’s main breaker meets the specifications of the household power distribution unit. The PE (equipment grounding) cable of the device must be connected firmly (1.6N·m). For AC circuit connections, copper (CU) conductors are recommended.
  • Page 4: Product Introduction

    AC output of the inverter only to form a backup system. The ABD supports one inverter and the MPD supports up to three inverters. Model Description This manual covers listed device below: ABD Series MPD Series • ABD200-40-US10 • MPD200-40-US10 •...
  • Page 5: Application Scenarios

    2.2 Application Scenarios Add an ABD (Automatic Backup Device) in the system to realize the whole home backup. Once the utility grid fails, the ABD will disconnect the main service panel from the utility grid, and the inverter will switch to off-grid working mode to supply power to the loads. 2.2.1 Application Scenarios - ABD •...
  • Page 6 2.2.2 Application Scenarios - MPD Inverter inverter PV module strings Inverter Utility Utility Grid meter PV module strings Inverter Hybrid inverter Household Main panel loads PV module strings Power cable Signal cable...
  • Page 7: Electrical Diagram

    2.3 Electrical Diagram 2.3.1 Electrical Diagram - ABD Main Panel Control Meter Board INVCB Inverter 2.3.2 Electrical Diagram - MPD Main Panel Control Meter Board INVCB Inverter INVCB Inverter INVCB Inverter...
  • Page 8 2.4 Appearance 2.4.1 Parts Part Description LED indicator Indicates the working status of the device. Lock To lock the device’s door (key included). Hanging bracket Hangs the device on the mounting support. Smart meter Contact after-sales service for support or replacement. Insulation board Ensures personal safety and protects the device.
  • Page 9 2.4.2 Dimensions 150mm 450mm (17.7in) (5.9in) 100mm 100mm (3.94in) (3.94in) 2.4.3 Indicators Indicator Status Explanation ON= The grid is abnormal and the system is in Back-up mode. BLINK = The grid is normal and the system is in On-grid mode. OFF = With no input source, the system is in waiting mode.
  • Page 10 2.5 Deliverables Waterproof nut Mounting Expansion Device *1 Screw *N bracket *1 remove tool *1 bolt *4 Communication 6AWG pin Terminal for 10AWG pin Cable Tie *2 terminal and terminal *N Neutral wire *N terminal *N CT *N Key *4 Documents *1 NOTICE N = Quantity depends on the device model.
  • Page 11: Installation Requirements

    3 Installation 3.1 Installation Requirements Installation Environment Requirements Prevent Child Access ≥200mm 7.87in ≥200mm ≥200mm 7.87in 7.87in ≥500mm ≥300mm 19.68in 11.81in ALT: 3000m -31°F~140°F IP44 9842ft (-35°C~60°C) TYPE 3R 0%~95%RH Installation Angle Requirements...
  • Page 12: Device Installation

    3.2 Device Installation NOTICE • Avoid the water pipes and cables buried in the wall when drilling holes. • Wear goggles and a dust mask to prevent the dust from being inhaled or contacting eyes when drilling holes. Step 1 Put the mounting bracket on the wall or the support horizontally and mark positions for drilling holes.
  • Page 13: Electrical Connection

    4 Electrical Connection 4.1 Safety Precaution DANGER INSTRUCTIONS PERTAINING TO A RISK OF FIRE OR ELECTRIC SHOCK • Perform electrical connections, including operations, cables, and component specifications in compliance with local laws and regulations ANSI/NFPA 70. • The input and output circuits are isolated from the enclosure and that system grounding, if required by the National Electric Code, ANSI/NFPA 70, is the responsibility of the installer.
  • Page 14: Wiring Specifications

    Conduit Hole Description Conduit Install the wiring conduit and run Grid-L1, Grid-L2, and AC Grid 2 inch conduit Neutral wire through the cable hole. Install the wiring conduit and run Load-L1, Load-L2, AC Loads 2 inch conduit Neutral wire, and PE through the cable hole. Install the wiring conduit and run Inverter-L1, Inverter Inverter-L2, Neutral wire, PE cable, and communication...
  • Page 15: Opening The Cabinet Door

    AC Grid Grid-L1, Grid-L2, • Terminal for connecting the Grid conductor. terminal • Recommended specification: 4/0-3AWG, copper Grid-N conductor, 90℃. AC Loads Load-L1, Load-L2, • Terminal for connecting the AC conductor of the terminal Load-N load. • Recommended specification: 4/0-3AWG, copper conductor, 90℃.
  • Page 16 4.4 Connecting the Conductors WARNING • Connect the conductors to the right terminals like L1, L2, and N. The device may be damaged if the conductors are connected inappropriately. • Make sure that the whole conductors are inserted into the terminal holes. No part of the conductor can be exposed.
  • Page 17 4.4.2 Connecting the AC Conductors (Load) Step 1 Strip the conductor wiring. Step 2 Remove the waterproof cover using the included cap removal tool. Step 3 Insert the desired conduit and corresponding adaptors, fittings, and bushings. Step 4 Insert the conductors into the device and tighten the conduit. 1.6N·m 10N·m 18-22mm...
  • Page 18 6-9mm 13-15mm 13-15mm 10-12mm 1.6N·m 0.8N·m 3N·m...
  • Page 19 4.4.4 Connecting the Communication Cable Step 1 Prepare a RJ45 network cable and insert it into the terminal. Step 2 Run the cable through the cable clip and the conduit. Inverter ABD or MPD 4.4.5 Connecting the CT Cable (Optional) NOTICE •...
  • Page 20: Check Before Power On

    Closing the Cabinet Door Step 1 Install the insulation board. Step 2 Tighten the six screws fix the insulation board(torque: 0.8Nm). Step 3 Optional. Lock up the device using the cabinet key. Keep the key properly for future use. 0.8N·m 5 Equipment Commissioning 5.1 Check Before Power ON Check Item...
  • Page 21: Maintenance

    6 Maintenance 6.1 Power OFF the Device DANGER INSTRUCTIONS PERTAINING TO A RISK OF FIRE OR ELECTRIC SHOCK • Power off the device before operations and maintenance. Otherwise, the device may be damaged or electric shocks may occur. • Delayed discharge. Wait until the components are discharged and the LED indicators are off after power off.
  • Page 22: Technical Parameters

    7 Technical Parameters 7.1 ABD Series Technical Parameters ABD200- ABD200- ABD100- ABD100- Technical Data 40-US10 63-US10 40-US10 63-US10 Electrical Data Nominal Output Voltage (V) Output Voltage Range (V) 211~264 Feed-in Type Split Phase Nominal AC Voltage of Line Conductor 120/240...
  • Page 23 7.2 MPD Series Technical Parameters Technical Data MPD200-40-US10 MPD200-63-US10 Electrical Data Nominal Output Voltage (V) Output Voltage Range (V) 211~264 Feed-in Type Split Phase Nominal AC Voltage of Line Conductor (V) 120/240 Nominal AC Frequency (Hz) AC Frequency Range (Hz) 58.5~61.2 Current Rating (From Grid)(A) Max.
  • Page 24 Website GoodWe Technologies Co., Ltd. No. 90 Zijin Rd., New District, Suzhou, 215011, China www.goodwe.com service@goodwe.com Contact Info 340-00797-03...