Overview Of The Evse, Inside - ABB Terra AC User Manual

Hide thumbs Also See for Terra AC:
Table of Contents

Advertisement

2.5.3

Overview of the EVSE, inside

A
B
C
Part
Maintenance cover
Ethernet connection
Socket for a Nano-SIM
card
Smart meter connection
Terminal block for the AC
input
Terminal block for the EV
charge cable
BCM.V3Y00.0-EN | 002 - DRAFT
A
B
Maintenance cover
Ethernet connection
Socket for a Nano-SIM card
D
Smart meter connection
E
Terminal block for the AC input
F
Terminal block for the EV charge
cable or the socket
Function
To prevent access to the electrical components of the
EVSE
To connect the ethernet cable
To connect the EVSE to the internet 3G/4G
To connect the cables for RS485 and ModBus
To connect the AC input cable from the grid
To connect the EV charge cable or the socket outlet
Description
C
D
E
F
15

Advertisement

Table of Contents
loading

Table of Contents