Piping And Instrumentation Diagram - Salda RIRS H EKO 3.0 Mounting And Installation Instruction

Table of Contents

Advertisement

• Before commencing the installation of the unit, please check if all ordered equipment have been delivered. Any variation from the ordered equip-
ment list must be reported to the product supplier.
5.4.

PIPING AND INSTRUMENTATION DIAGRAM

Figure 5.4.1. * KE1 - only in electrical version; * KV1 - used in water version; ** Possible to control.
THE LIST OF COMPONENTS
PV
Supply air fan
PF
TE
Exhaust air temperature sensor
DTJ
Extract air temperature and humidity sensor
PC
Computer
M2
Outdoor air damper actuator
TL
Outdoor air temperature sensor
NET
R
Rotor heat exchanger
KV1
Water heater*
M4
Water heater circulation pump*
RC2
Stouch, Flex or ST-SA-Control remote control panel
TV1
Water heater temperature sensor *
* Component/possibility to connect it depends on model.
POSSIBLE PCB INPUTS/OUTPUTS
FA
Fire alarm
RIRS 400-700 H EKO 3.0 v2023.2
IF
IV
Exhaust fan
TJ
Supply air temperature sensor
CO
CO
sensor
2
2
KE1
Electric heater*
M3
Exhaust air damper actuator
Ventilated premises
MB-Gateway
DX
DX cooler
T1
Water heater thermostat*
M5
Water cooler valve motor
M6
Water heater valve motor*
M1
Rotor motor
H1
Working indication output
H2
Alarm indication output
EN |
9

Advertisement

Table of Contents
loading

Table of Contents