3-2.3. Measure Screen - Njoy Garun 30KL User Manual

3 phase in / 3 phase out ups
Hide thumbs Also See for Garun 30KL:
Table of Contents

Advertisement

Battery test
It will show "Battery Test" if the UPS is not in test. Touch "Yes" to start
battery test. Then, it will show "Battery testing....." during battery test period.
After few seconds, battery test result will show on the screen. Touch "Back"
to return to main screen immediately or "No" to cancel this operation and
back to main screen. It will show "Cancel battery test" if the UPS is in test.
Battery Test
Audio mute
It will show "Mute all" if the audio is active. Touch "Yes" to activate mute. If
"Mute all" is active, it will show
screen. Touch "Back" to return to CONTROL screen immediately or "No" to
cancel this operation and back to CONTROL screen.
It will show "Cancel Mute All" if the UPS is mute already. Touch "Yes" activate
audio function or "No" to keep mute. Touch "Back" to return to CONTROL
screen.
Mute All
18
Cancel Battery Test
icon on the top left corner of the main
Cancel Mute All
ON/OFF Charger
It will show "Turn on Charger?" when charger is off.
It will show "Turn off Charger?" when charger is on.
Touch "YES" to turn on or off the charger. Then, the screen will return to
main screen.
Touch "Back" to return to CONTROL screen immediately or "No" to cancel
this operation and back to CONTROL screen.
Turn on Charger
3.2.3. Measure screen
Touch the icon
to enter measure page. Touch the icon
browse information. Touch the icon
icon
to go back to previous menu.
Measure screen page 1
LINE VOL: The real time value of R, S and T phase voltage, RS, ST, TR voltage
and input frequency.
INVERTER VOL: The real time value of R, S and T inverter voltage, RS, ST and
TR voltage and frequency.
BYPASS VOL: The real time value of R, S and T bypass voltage, RS, ST and TR
voltage and frequency.
Turn off Charger
or
to
to return to main screen. Touch the
19

Advertisement

Table of Contents
loading

Table of Contents