Software Installation; Operations; Initial Operation; Screen Description - Njoy Garun Series User Manual

3 phase in / 3 phase out ups
Hide thumbs Also See for Garun Series:
Table of Contents

Advertisement

Wiring diagram of parallel system for Garun 30KL, 40KL
Wiring diagram of parallel system for Garun 60KL, 80KL

2.5. Software installation

For optimal computer system protection, install UPS monitoring software
from
https:/
/www.power-software-download.com/viewpower.html.
16
3

Operations

3.1. Initial operation

Step 1.
Before operation, make sure that the two strings of batteries are
connected correctly in order
of "+,GND,-" terminals and the breaker of the
battery pack is at "ON" position (only for long-run model).
Step 2.
POWER button to set up the power supply for the
Press the
UPS. UPS will enter to power on mode. After initialization, UPS will enter to
"No Output mode".

3.2. Screen description

After initialization, the LCD will display main screen.
There are five sub-menus: Control, measure, setting, information and data log.
Touch any sub-menu icon to enter into the sub-screen.
ON/OFF UPS
Battery test
Control
Mute all
ON/OFF charger
Measure 1
Measure
Measure 2
Measure 3
Main
Setting
General
Advance
Save setting
Basic info
Info
Rated info
Parameter info
Data Log
Electrical
Battery
Miscellaneous
User mode
Password: 0000
Basic 1
Maintaner mode
Password: ****
Basic 2
SYS parameter
User
Install info
Maintainer
VOL CALLI
CURR CALLI
Initial
Data log
Electrical
Parameters
Battery
Calibration
Miscellaneous
EEPROM
UPS self-test
Touch
17

Advertisement

Table of Contents
loading

Table of Contents