Goodrive800 Pro Series Regenerative Rectifier Hardware Manual
6 Maintenance and inspection
6.1 Periodical maintenance
6.1.1 Overview
Only trained and qualified professionals are allowed to maintain the equipment.
Before operating the interior of the equipment:
Disconnect the power to the equipment (note that no switch/breaker installed in the cabinet can
disconnect the power to the equipment).
Wait 25 minutes for the DC circuit capacitor to discharge.
Ensure that the DC bus voltage is lower than 36V.
6.1.2 Required tools
These tools are used to remove and install devices, screws, and other components during maintenance and
repair.
A set of torque wrench or sleeve
A set of open end wrench or sleeve
A set of hexagonal wrench
A medium-sized straight screwdriver and a small-sized straight screwdriver
A medium-sized cross screwdriver
Cart
Attached table
Screw thread tightening torque (Fastener grade: 4.8; unit: N.m)
Screw thread specification
M5
M6
M8
M10
M12
M16
6.1.3 Maintenance cycle
Little maintenance is required when the VFD is installed in an environment that meets requirements. The
following table describes the routine maintenance periods recommended by us.
Maintenance cycle
Once per 6–12 months (based on the site
installation environment)
Once per 6–12 months (based on the site
installation environment)
Once per year (VFD stored without use)
202308 (V1.1)
Copper bar connection
Once per year
Every 6 years
Every 10 years
30
45
110
220
390
980
Maintenance work description
Check according to the following table
Heat sink inspection and cleaning
Capacitor aging
Air filter check. Replace it when necessary.
Replace the fans for the filter and power units
Capacitor replacement
Maintenance and inspection
Metal sheet connection
20
30
85
164
285
710
50
Need help?
Do you have a question about the Goodrive800 Pro Series and is the answer not in the manual?
Questions and answers