Alternator (2)

Electrical system insulation monitoring
The function of the protective insulation monitoring measure must be checked every
day before starting work.
This check only checks the function of the insulation monitor, not whether an insula-
A
tion error has occurred on the heating sections or consumers.
- Start the paver finisher's drive engine.
- Switch heating system switch (1) to ON.
- Press test button (2).
- The indicator lamp integrated into the test button signals "insulation fault".
- Press reset button (3) for at least 3 sec. to delete the simulated fault.
- The indicator lamp goes out.
F 83.18 6
1
2
3