• Installation abstract
Electricity meter connection methods mentioned here can be adapted for the System controller
and Touch panel controller (TPC). However, the setting restrictions mentioned here must be ob-
served.
– Multiple VRF networks can be connected to 1 electricity meter. (with network crossover)
NOTE: Combination of UTY-ALGXZ1 and UTY-PLGXE2 does not multiple VRF networks.
Whm
– With the electricity charge apportionment function, an electricity meter system cannot span TPC.
Whm
Whm
Whm
Whm
Whm
Whm
Whm
2-30. Electricity charge apportionment setting (System controller, Touch panel
controller)
VRF network system 1
VRF network system 2
VRF network system 3
TPC1 management range
TPC1
TPC2
TPC2 management range
TPC1 management range
TPC1
TPC2
TPC2 management range
- (07-159) -
Whm
VRF network system 1
VRF network system 2
Whm
VRF network system 3
Whm
Create an electricity meter system within
the range of the units managed by each
TPC.
An electricity meter system spanning units
managed by TPC cannot be created.