Wacker Neuson RD 24 Instruction Manual page 156

Tandem roller / combination roller
Hide thumbs Also See for RD 24:
Table of Contents

Advertisement

Assembly Instructions and Auxiliary Devices
Injection of antifreeze for the sprinkler
Fill the piping system
156
A
B
1. Shut down the diesel engine.
2. Switch the sprinkler to spray nozzle control when the machine is at a
standstill.
3. Take the injection hose [A] out of its holder, and clean the end of the
hose if necessary.
4. Insert the injection hose into the container [C] containing antifreeze
solution.
5. Set the switchover valve [B] to antifreeze injection (lever horizontal).
6. Fill the piping system until the antifreeze solution exudes out of all the
spray nozzles.
7. Switch off the sprinkler.
8. Switch off the electrical system, and remove the ignition key.
9. Put the injection hose [A] back in its holder.
10. Set the switchover valve [B] to sprinkle (lever vertical).
B
A
C
16969
BA RD24_RD28 en us 06

Advertisement

Table of Contents
loading

Table of Contents