Calculation Of Safety Distance If Protective Fields Act Orthogonally To The Approach Direction - Leuze electronic MLC 500 Original Operating Instructions

Safety light curtains
Hide thumbs Also See for MLC 500:
Table of Contents

Advertisement

NOTICE
If longer stopping times are determined during regular inspections, an appropriate additional
time must be added to t
6.1.2

Calculation of safety distance if protective fields act orthogonally to the approach direction

With vertical protective fields, ISO 13855 differentiates between
• S
: safety distance concerning access through the protective field
RT
• S
: safety distance concerning access over the protective field
RO
The two values are distinguished by the way additional distance C is determined:
• C
: from a calculation formula or as a constant (see chapter 6.1.1 "Calculation of safety distance S")
RT
• C
: from the following table "Reaching over the vertical protective field of electro-sensitive protective
RO
equipment (excerpt from ISO 13855)"
The larger of the two values S
Calculation of safety distance S
field:
Calculation of safety distance S
S
[mm]
RT
K
[mm/s]
T
[s]
t
[s]
a
t
[s]
i
t
[s]
m
C
[mm]
RT
Calculation example
The feeding-in area in a press with a stopping time (including press Safety PLC) of 190 ms is to be safe-
guarded with a safety light curtain with 20 mm of resolution and 1200 mm of protective field height. The
safety light curtain has a response time of 22 ms.
Ä Calculate safety distance S
K
[mm/s]
T
[s]
C
[mm]
RT
S
[mm]
RT
S
[mm]
RT
S
is smaller than 500 mm; this is why the calculation may not be repeated with 1600 mm/s.
RT
NOTICE
Implement the stepping behind protection required here, e.g., through the use of an additional or
cascaded safety sensor for area protection.
Leuze electronic
.
m
and S
RT
RO
acc. to ISO 13855 when access occurs through the protective
RT
for point of operation guarding
RT
=
Safety distance
=
Approach speed for point of operation guarding with approach reaction and normal approach di-
rection to the protective field (resolution 14 to 40 mm): 2000 mm/s or 1600 mm/s, when
S
 > 500 mm
RT
=
Total time of the delay, sum from (t
=
Response time of the protective device
=
Response time of the safety relay
=
Stopping time of the machine
=
Additional distance for point of operation guarding with approach reaction with resolutions of
14 to 40 mm, d = resolution of protective device C
using the formula acc. to ISO 13855.
RT
=
2000
=
(0.022 + 0.190)
=
8 × (20 - 14)
=
2000 mm/s × 0.212 s + 48 mm
=
472
is to be used.
 + t
 + t
)
a
i
m
MLC 520 Host/Guest
 = 8 × (d - 14) mm