Connection and commissioning
5.5 Commissioning and parameter assignment
Concluding commissioning
1. Disconnect the Ethernet cable from the charging station.
2. Lock the housing door with the key.
3. Remove the packing material and protective films.
4. Clean the unit if required.
5. Complete the commissioning report in accordance with the regional regulations, e.g.
DGUV regulation 3.
NOTE
The SICHARGE CC AC22 charging stations are designed for continuous operation. Daily
reboots (power cycle) may affect the service life of the components.
62
SICHARGE Operating Instructions MID
Operating Instructions, 02/2023, A5E48573001-AF