12. Loading upper shafts
12A. Remove upper supply and rewind shafts
1. Remove and load the upper shafts from the rear of the machine
2. Rotate the locking outer sleeves on both sides in the direction of the
arrow to their open position, aligned with the inner sleeve indicated
in Figure 1
3. Remove both upper shafts
Gfp 300 Series
Figure 1
Locking outer Sleeve
15
June 2023