2.9 AC ELECTRICAL POWER WIRING

The AERCO Benchmark Electrical Power Wiring Guide, GF-2060, must be consulted prior to connecting
any AC power wiring to the unit. External AC power connections are made to the unit inside the Power
Box, which is located on the upper right front of the unit (Figure 2-8). Open the unit front panel to access
the Power Box. Loosen the two upper screws of the Power Box cover and remove cover to access the
internal connections, as shown in Figure 2-9.
Figure 2-8: Power Box Location and Cover
OMM-0099_0A
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Page 23 of 234
GF-145
Ph.: 800-526-0288
PR1: 05/21/2014

Advertisement

Table of Contents
loading

This manual is also suitable for:

Benchmark 3000df

Table of Contents