LIFTING LUGS
(3 POSITIONS)
In multiple unit installations, it is important to plan the position of each unit in advance. Sufficient space for
piping connections and future service/maintenance requirements must also be taken into consideration.
All piping must include ample provisions for expansion.

2.5 SUPPLY AND RETURN PIPING

The Benchmark Boiler utilizes 4" 150# flanges for the water system supply and return piping connections.
The physical location of the supply and return piping connections are on the rear of the unit as shown in
Figure 2-3.
2" NATURAL GAS INLET
2" PROPANE INLET
HOT WATER OUTLET
WATER INLET
CONDENSATE
Page 18 of 234
05/21/2014
CHAPTER 2 – INSTALLATION
Figure 2-2: Boiler Lifting Provisions
(SUPPLY)
AIR INLET
PRIMARY
(RETURN)
EXHAUST
MANIFOLD
DRAIN
Figure 2-3: Supply and Return Locations
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Phone: 800-526-0288
DRAIN VALVE
OMM-0099_0A
GF-145