7.1 MAINTENANCE SCHEDULE

The unit requires regular routine maintenance to keep up efficiency and reliability. For best operation and
life of the unit, the following routine maintenance procedures should be performed in the time periods
specified in Table 7-1. For a complete inspection check list see ASME CSD-1 chart.
In order to perform the maintenance tasks specified in Table 7-1, the following maintenance kits are
available through your local AERCO Sales Representative:
• Annual Maintenance Kit, Part No. 58025-01
• 24-Month Waterside/Fireside Inspection Kit, Part No. 58025-10 (See NOTE below)
The 24-Month Waterside/Fireside Inspection Kit also includes the items
contained in the Annual Maintenance Kit (58025-01). Therefore, only Kit
Part No. 58025-10 is required when performing the waterside/fireside
inspections. Refer to Appendix J for recommended spare
To avoid personal INJURY, prior to servicing ENSURE THAT THE
FOLLOWING GUIDELINES ARE STRICTLY OBSERVED:
• Disconnect the AC supply by turning off the service switch and
AC supply circuit breaker.
• Shut off the gas supply at the manual shut-off valve provided
with the Unit
• Allow the Unit to cool to a safe water temperature to prevent
burning or scalding
Section

Igniter-Injector

7.2
(66013)
Flame Detector
7.3
(66020)
7.4
Lean O
Sensor (61026)
2
4.3 & 4.4
Combustion Calibration
Testing of Safety
7.5
Devices
7.6
Burner
7.7
Condensate Drain Trap
7.8
Air Filter (88014)
7.9
12V Fan
* Only performed after initial 6 month period after initial startup.
7.2 IGNITER-INJECTOR
The igniter-injector (part no. 66026) is located on the burner plate at the top of the boiler. In addition to
providing the ignition spark required to light the burner, the igniter-injector also contains a gas injector
tube which connects to the staged ignition assembly. Figure 7-1 shows the complete burner assembly
OMM-0099_0A
GF-145
CHAPTER 7 – MAINTENANCE

CHAPTER 7. MAINTENANCE

WARNING!
Table 7-1: Maintenance Schedule
Item
6 Mos.
*Inspect
*Inspect
*Inspect
*Check
*Inspect
Inspect
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Ph.: 800-526-0288
NOTE
12 Mos.
Inspect
Inspect
Inspect
Check
See ASME CSD-1
Chart
Inspect, Clean &
Replace Gaskets
Clean
Inspect
Labor
24 Mos.
Time
Replace
15 mins.
Replace
15 mins.
15 mins.
1 hr.
45 mins.
Inspect
2 hrs.
Inspect, Clean &
30 mins.
Replace Gaskets
Replace
15 mins.
Inspect
Inspect