Shutting The Boiler Down For An Extended Period Of Time; Placing The Boiler Back In Service After A Prolonged Shutdown - Aerco BENCHMARK 2500DF User Manual

Dual fuel gas-fired boiler
Table of Contents

Advertisement

Benchmark 2500DF-3000DF Installation, Operation & Maintenance Manual

7.10 SHUTTING THE BOILER DOWN FOR AN EXTENDED PERIOD OF TIME

If the boiler is to be taken out of service for an extended period of time (one year or more), the following
instructions must be followed.
1. Set ON/OFF switch on the front panel to the OFF position to shut down the boiler's
operating controls.
2. Disconnect AC power from the unit.
3. Close the water supply and return valves to isolate boiler.
4. Close external gas supply valve.
5. Open relief valve to vent water pressure.
7.11 PLACING THE BOILER BACK IN SERVICE AFTER A PROLONGED
SHUTDOWN
After a prolonged shutdown (one year or more), the following procedures must be followed:
Return to Service After Extended Shut-Down
1. Review installation requirements included in Chapter 2.
2. Inspect all piping and connections to the unit.
3. Inspect exhaust vent and air inlet duct work (if applicable).
4. Perform initial startup per Chapter 4.
5. Perform safety device testing and scheduled maintenance procedures per Chapters 6 and
7 of this manual.
Page 102 of 234
05/21/2014
CHAPTER 7 – MAINTENANCE
Extended Shut-Down
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Phone: 800-526-0288
OMM-0099_0A
GF-145

Advertisement

Table of Contents
loading

This manual is also suitable for:

Benchmark 3000df

Table of Contents