Chapter 2. Installation; Introduction; Receiving The Unit; Unpacking - Aerco BENCHMARK 2500DF User Manual

Dual fuel gas-fired boiler
Table of Contents

Advertisement

Benchmark 2500DF-3000DF Installation, Operation & Maintenance Manual

2.1 INTRODUCTION

This Chapter provides the descriptions and procedures necessary to unpack, inspect and install the
AERCO Benchmark Model BMK 2500 or 3000 Dual Fuel boiler.

2.2 RECEIVING THE UNIT

Each Benchmark Boiler System is shipped as a single crated unit. The shipping weight for these models
is approximately 2200 pounds. The unit must be moved with the proper rigging equipment for safety and
to avoid equipment damage. The unit should be completely inspected for evidence of shipping damage
and shipment completeness at the time of receipt from the carrier and before the bill of lading is signed.
AERCO is not responsible for lost or damaged freight. Each unit
has a Tip-N-Tell indicator on the outside of the crate. This
indicates if the unit has been turned on its side during shipment. If
the Tip-N-Tell indicator is tripped, do not sign for the shipment.
Note the information on the carrier's paperwork and request a
freight claim and inspection by a claims adjuster before
proceeding. Any other visual damage to the packaging materials
should also be made clear to the delivering carrier.

2.3 UNPACKING

Carefully unpack the unit taking care not to damage the unit enclosure when cutting away packaging
materials
After unpacking, a close inspection of the unit should be made to ensure that there is no evidence of
damage not indicated by the Tip-N-Tell indicator. The freight carrier should be notified immediately if any
damage is detected.
The following accessories come standard with each unit and are either packed separately within the unit's
shipping container or are factory installed on the unit:
Pressure/Temperature Gauge
ASME Pressure Relief Valve
Condensate Drain Trap (part no. 24060)
2" Gas Supply Shutoff Valve
When optional accessories are ordered, they may be packed within the unit's shipping container, factory
installed on the unit, or packed and shipped in a separate container. Any standard or optional accessories
shipped loose should be identified and stored in a safe place until ready for installation or use.
Ithink I need to hire an engineer to look afterHa!
OMM-0099_0A
GF-145
CHAPTER 2 – INSTALLATION

CHAPTER 2. INSTALLATION

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Ph.: 800-526-0288
NOTE
Page 15 of 234
PR1: 05/21/2014

Advertisement

Table of Contents
loading

This manual is also suitable for:

Benchmark 3000df

Table of Contents