Temperature Checkout - IBM IntelliStation R Pro Hardware Maintenance Manual

Table of Contents

Advertisement

Temperature checkout

7.
Reinstall the server/workstation cover and connect the cables.
8.
Turn on the server/workstation.
9.
Start the Configuration/Setup Utility program and set configuration parameters.
Set the system date and time.
Set the power-on password.
Reconfigure the server/workstation.
Proper cooling of the system is important for proper operation and system reliability.
For a typical xSeries server/workstation, you should make sure:
Each of the drive bays has either a drive or a filler panel installed
The top cover is in place during normal operation
There is at least 50 mm (2 inches) of ventilated space at the sides of the
server/workstation and 100 mm (4 inches) at the rear of the server/workstation
The top cover is removed for no longer than 30 minutes while the
server/workstation is operating
A removed hot-swap drive is replaced within two minutes of removal
Cables for optional adapters are routed according to the instructions provided
with the adapters (ensure that cables are not restricting air flow)
The fans are operating correctly and the air flow is good
A failed fan is replaced within 48 hours
In addition, ensure that the environmental specifications for the system are met. See
"Features and specifications" on page 4.
Note: The server/workstation is not designed to operate in an enclosed
environment. The xSeries 330 should not reside behind a glass door in its rack
enclosure.
For more information on specific temperature error messages, see "Temperature error
messages" on page 134.
25
Diagnostics

Advertisement

Table of Contents
loading

This manual is also suitable for:

330 xseries86746851

Table of Contents