VOGE SR1 Operation Manual page 55

Table of Contents

Advertisement

The replacement for coolant
·The coolant drainage:
–Keep the motorcycle upright by standing rack.
–Lay a liquid tray under the engine.
–Remove the water drainage bolt, because all the heat radiation system is
connected, so all the coolant may flow out from this port.
–After the old coolant drained off, install and fasten the water drainage bolt
in place.
·The coolant filling-up:
–The coolant need be filled up from the heat radiator and expansion tank the
two positions:
–Open the tank cap of heat radiator and fill up with the coolant
–Check the full filling-up of coolant from the tank cap of heat radiator, pinch
the water tube until it is full, then well
cover the tank cap.
–After the tank's cap of heat radiator covered, start and run the engine for 30
seconds to make the coolant fully reach every position need it.
–Make the engine stop, after the engine cooled down, open once again the tank's cap of heat radiator, check if the
coolant already was full, in case the level fell down, please fill up once again until it is full, then well cover the tank's
cover of heat radiator, repeat this action until it gets full, in case it is necessary, it may need to repeat two times or more.
–Remove the black rubber cap of expansion tank, then fill up with coolant to the level between scale mark UPPER
and LOWER.
Fill up with running water is not allowed, otherwise it may damage the cooling
system, the mixture among coolant of different brand of specification is not allowed.
51
!
Warning
Drainage bolt
Filling-up port

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents