Gas Feeding; Gas Feed Connection To The Burner; General Gas Supply Layout (Example) - Riello DB 4 SM C03 A0 TC FS1 FB T150 Installation, Use And Maintenance Instructions

Industrial gas burners
Hide thumbs Also See for DB 4 SM C03 A0 TC FS1 FB T150:
Table of Contents

Advertisement

Available languages

Available languages

5.9

Gas feeding

Explosion danger due to fuel leaks in the pres-
ence of a flammable source.
Precautions: avoid knocking, attrition, sparks and
heat.
Make sure the fuel interception tap is closed be-
fore performing any operation on the burner.
The fuel supply line must be installed by qualified
personnel, in compliance with current standards
and laws.
WARNING
5.9.1

Gas feed connection to the burner

The burner connection to the gas train is carried out by way of at-
tachment to the flange.
The dimensions of the flange are shown in Fig. 8, page 13.
Use the relative adapters to connect the gas flange to the train,
supplied as accessories.
D7543
Installation
5.9.2

General gas supply layout (example)

Key (Fig. 15)
C
Vibration damping joint
GF
Gas filter
HPG High gas pressure regulator
LPG
Low gas pressure regulator
MM
Pressure gauge
PA
Minimum air pressure switch
PGM Maximum gas pressure switch
PGm Minimum gas pressure switch
RG
Gas butterfly valve
SRV
Pressure limiting valve with outlet into the environment
VE
Fan
VPS
Leak detection control device
VR
Gas pressure regulator solenoid valve
VS
Gas safety solenoid
PART THAT IS THE RESPONSIBILITY
17
GB
OF THE INSTALLER/USER
max. 500 mbar
0,5 ÷ 4 bar
Fig. 15
20117017