Uic Transformer - Maytag MLE22PD Service Manual

Commercial stack washer/dryer 50hz
Table of Contents

Advertisement

Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before
operating.
Failure to do so can result in death or
electrical shock.
1. Unplug washer or disconnect power.
2. Remove the washer front panel
(See page 4-58).
3. Remove the screw caps that are factory
installed on transformer screw tips that point
out the front of the washer front support
bracket. Reinstall the screw caps when the
transformer is remounted and secured.
Screw
Caps
4. Lift the locking tabs and disconnect the wire
harness connector.
Wire Harness
Connector

uiC TranSFOrMer

5. Remove two 1/4" T-20 hex head screws
6. Release the wire clip securing the
7. Pull wires out through hole in the bracket.
Wire Clip
Two 1/4"
Hex Head
Screws
4-57
securing the transformer to the inside right
end of the washer front support bracket.
transformer wiring behind the bracket.
Secondary
Hole In
Bracket
Primary
nOTe: 230 volts comes into the
transformer primary. Power coming out of
the secondary is divided into the various
power outputs needed to run different
circuits in the washer. The two white wires
will have approximately 20 volts. The two
red wires will have about 26 volts. Blue to
yellow wires will have about 4.5 volts.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mle22pnMlg22pdMlg22pn

Table of Contents