Before a capacity test, ensure that:
● The UPS is working in normal mode; float charging or hibernation has lasted
● The UPS has generated no battery overtemperature, overvoltage, or overcurrent
● The mains, batteries, charger, and discharger are normal. No overload alarm is
● The SmartLi has generated no alarms related to lithium batteries.
Procedure
Step 1 On the home screen of the UPS LCD, choose System Info > Maintenance >
Battery Maint.
Step 2 Tap Start next to Capacity Test to start a capacity test.
Figure 6-5 Starting a capacity test
----End

6.3.3 Test Data Download

Issue 17 (2023-07-10)
NO TICE
for 2 hours after the SOC reaches 100%; the load rate fluctuation is less than
10%.
alarm. No generator is connected to the UPS.
generated.
NO TE
The capacity test automatically stops in any of the following cases:
● The minimum cell voltage reaches 2.65 V.
● The load fluctuation exceeds 10%.
● A fault alarm is generated.
The test is complete when the minimum cell voltage reaches 2.65 V. Data about the most
amount of energy discharged is stored once a month for 36 months.