Table 3-2
UPS5000-E-200K-SM/FM.
Table 3-2 Power cable terminal requirements for the UPS5000-E-200K-SM
Port
Descript
ion
Mains
input
Bypass
input
Battery
input
Output
PE
Table 3-3 Power cable terminal requirements for the UPS5000-E-200K-FM
Port
Descript
ion
Mains
input
Bypass
input
Battery
input
Output
Issue 17 (2023-07-10)
The AC voltage loss is less than 3%, and the DC voltage loss is less than
1%.
200 kVA: single- or multi-core 90°C soft power cable with a copper
conductor; 300 kVA: single-core 90°C soft power cable with a copper
conductor.
It is recommended that the 200 kVA AC power cable should not be longer
than 30 meters and the DC power cable should not be longer than 40
meters. The 300 kVA AC power cable should not be longer than 30
meters and the DC power cable should not be longer than 50 meters.
and
Table 3-3
Connection
Method
Crimped OT
terminals
Crimped OT
terminals
Crimped OT
terminals
Crimped OT
terminals
Crimped OT
terminals
Connection
Method
Crimped OT
terminals
Crimped OT
terminals
Crimped OT
terminals
Crimped OT
terminals
Copyright © Huawei Digital Power Technologies Co., Ltd.
list the requirements for power cable terminals of the
Bolt
Bolt Hole
Specifica
Diameter
tions
M10
10.5 mm
M10
10.5 mm
M12
13.5 mm
M10
10.5 mm
M10
10.5 mm
Bolt
Bolt Hole
Specifica
Diameter
tions
M10
10.5 mm
M10
10.5 mm
M12
13.5 mm
M10
10.5 mm
3 Installation
Bolt Length Torque
30 mm
26 N·m
30 mm
26 N·m
45 mm
46 N·m
30 mm
26 N·m
30 mm
26 N·m
Bolt Length Torque
40 mm
26 N·m
40 mm
26 N·m
60 mm
46 N·m
40 mm
26 N·m
71