Huawei UPS5000-E-200K-SM User Manual page 87

50 kva power modules
Hide thumbs Also See for UPS5000-E-200K-SM:
Table of Contents

Advertisement

UPS5000-E-(200 kVA-300 kVA)
User Manual (50 kVA Power Modules)
Figure 3-8 Installing expansion bolts (unit: mm)
1.
2.
3.
4.
Step 3 Move the cabinet over its castors to the installation position.
Step 4 (Optional) If the castors of the UPS need to be lifted from the ground, perform
steps
Step 5 Remove the rear panel of the cabinet, and then open the front door.
Issue 17 (2023-07-10)
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to
60 mm.
Partially tighten the expansion bolt and vertically insert it into the hole. Hit
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
Step 1
to
Step 2
in
Copyright © Huawei Digital Power Technologies Co., Ltd.
Unsecured
Installation.
3 Installation
79

Advertisement

Table of Contents
loading

Table of Contents