UPS5000-E-(200 kVA-300 kVA)
User Manual (50 kVA Power Modules)
Figure 3-29 Position of a battery grounding failure detector in a UPS5000-E-300K-
SMT (isolation protection)
(1) Battery grounding failure detector
----End
3.2.3.8 Connecting the iBAT
Procedure
Step 1 Connect the COM_OUT port on the CIM of the iBAT to the COM2 port on the
monitoring interface card.
Figure 3-30 COM2 port
----End
Issue 17 (2023-07-10)
Copyright © Huawei Digital Power Technologies Co., Ltd.
3 Installation
93