UPS5000-E-(200 kVA-300 kVA)
User Manual (50 kVA Power Modules)
● Ensure that all UPS upstream input switches are turned off before connecting
● Determine the actual number of ground cables based on
● Prepare the OT terminals onsite to ensure that the length of the copper wire is
Figure 3-35 Ground cable
Step 4 Route power cables.
●
Issue 17 (2023-07-10)
NO TICE
cables.
requirements. The following figure is for reference only.
the same as that of the part of the OT terminal that covers the conductor.
NO TE
●
: Internal equipotential connection
●
: Protective ground
Two power sources
Remove the copper bars between mains and bypass input terminals, as shown
in
Figure
3-36.
Copyright © Huawei Digital Power Technologies Co., Ltd.
3 Installation
Table 3-1
and the site
97