Step 12 Connect ground cables and power cables.
Issue 17 (2023-07-10)
Figure 3-82 Removing large covers
NO TE
– The number of holes to be drilled is for reference only.
– If holes are drilled for routing cables, attach grommet strips on the hole edges to
protect cables.
NO TE
For the screw specifications and torque used for connecting cables in a bottom cable
routing scenario, refer to the top cable routing scenario. This section only shows the cable
routes in the bottom cable routing scenario.