Shallow Discharge Test - Huawei UPS5000-E-200K-SM User Manual

50 kva power modules
Hide thumbs Also See for UPS5000-E-200K-SM:
Table of Contents

Advertisement

UPS5000-E-(200 kVA-300 kVA)
User Manual (50 kVA Power Modules)

6.3.1.2 Shallow Discharge Test

Before performing a shallow discharge test, ensure that:
● If the battery has been replaced, choose System Info > Settings > Battery
● The UPS works in normal mode with a load ratio fluctuation less than 10%.
● The UPS does not generate any battery overtemperature, overvoltage, or
● The mains, batteries, charger, and discharger are normal. No overload alarm is
Automatic Shallow Discharge Test
Step 1 On the home screen of the LCD, choose System Info > Settings > Battery
Settings and set Sched. shallow dis. test to Enable.
Step 2 Set Sched. shallow dis. test time and Sched. shallow dis. test interval as
required. After the setting is complete, the system will perform an automatic
shallow discharge test based on the settings.
----End
Manual Shallow Discharge Test
Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery
Maint.
Step 2 Tap Start next to Shallow Dis. Test to start a shallow discharge test.
Figure 6-2 Starting a shallow discharge test
Issue 17 (2023-07-10)
NO TICE
Settings on the LCD and verify that the value of Installation time has been
changed based on the actual situation before testing the battery.
overcurrent alarm. No generator is connected to the UPS.
generated.
Copyright © Huawei Digital Power Technologies Co., Ltd.