Step 7 Synchronize parallel parameters.
1.
2.
Step 8 Measure the bypass input voltage of each UPS.
1.
2.
Step 9 Clear the EPO state of each UPS. For details, see
Step 10 Measure the output voltage of each UPS.
1.
2.
Issue 17 (2023-07-10)
Table 5-2 Battery Settings
Item
Battery string
sharing
If the Inconsistent parallel param. alarm is generated, choose System Info >
Settings on the LCD and tap Parameter Sync to synchronize parameters
between UPSs in the parallel system.
Check that no alarm is generated for any UPS and perform subsequent
operations. If an alarm is generated, follow the troubleshooting suggestion to
clear the alarm first.
Check that no Bypass abnormal alarm is generated for any UPS in the
system. Then, none of the UPSs supplies power.
Set the multimeter to the AC voltage position, connect the red probe to UPS 1
bypass input phase A, and connect the black probe to UPS 2 bypass input
phase A to measure the bypass input voltage difference between UPSs.
Perform the same operations on phases B and C. Complete the measurement
between every two UPSs in the parallel system. If the phase sequence is
correct and the voltage difference is less than 5 V, perform the subsequent
operations. If the phase sequence is incorrect or the voltage difference for a
phase between any two UPSs is greater than 5 V, power off the parallel
system completely, and check whether the bypass input cables for the UPS
parallel system are properly connected.
CA UTION
Exercise caution when performing operations with power on. There are many
electrified parts in the UPS wiring area. It is recommended that the test be
performed in the external power distribution area of the UPS.
Check that no Bypass abnormal alarm is generated for any UPS in the
system. Then, all UPSs in the system supply power in bypass mode.
Set the multimeter to the AC voltage position, connect the red probe to UPS 1
output phase A, and connect the black probe to UPS 2 output phase A to
measure the output voltage difference between UPSs. Perform the same
operations on phases B and C. Complete the measurement between every
two UPSs in the parallel system. If the phase sequence is correct and the
Copyright © Huawei Digital Power Technologies Co., Ltd.
Setting
Description
Set this
If the parallel system shares one
parameter as
battery string, set this parameter to
required.
Enable.
If each UPS uses an independent
battery string, set this parameter to
Disable.
5 Parallel System Commissioning
8.5 Clearing the EPO
State.