6.2.4
Guide the cables to the cabinet
Preliminary requirements
Procedure
1. Guide the AC input cable, the AC
auxiliary power cable, the interlock
and DC guard and the CAN cables (A)
through the opening (B).
2. Guide the DC output cables (C)
through the opening (D).
6.2.5
Close the cable inlets
1. Move the sliding plates (B) on the
guidance plate to close the cable
inlets and hold the cables (C) in place.
2. Tighten the fasteners (A).
6.2.6
Install the front cover plate (concrete foundation)
Preliminary requirements
9AKK107992A2254-EN | 005
•
The cable inlets are open.
•
The cabinet is installed on
the foundation.
•
Torque wrench
B
A
C D
C
B
•
Four fasteners M10
Installation
A
39