Reference Manual
00809-0100-4110
2
Install
WARNING
Failure to follow safety instructions could result in serious injury or death.
Before installing this equipment, read the Essential instructions at the front of this
Reference Manual.
WARNING
ELECTRIC SHOCK
Failure to install covers and ground leads could result in serious injury or death.
Install all protective equipment covers and safety ground leads after installation.
CAUTION
Equipment damage
Damage to the transmitter may result.
Do not allow the temperature of the probe electronics to exceed 194 °F (90 °C)
2.1
Install probe
Emerson can supply a weld plate for welding to the flue gas duct for new installations.
Procedure
1. If using the standard square weld plate
2. Insert probe through the opening in the mounting flange and bolt through the
Reference Manual
plate, weld or bolt the plate onto the duct.
The through hole diameter in the stack or duct wall and refractory material must be
at least 2.5 in. (63.5 mm).
probe gasket and flange.
For horizontal installations, the breather port must be oriented such that it is facing
downward.
(Figure
2-2) or an optional flange mounting
Install
May 2023
11