Procedure - Zirkon zahn M2 MILLING UNIT COMFORT LINE Operation And Maintenance Manual

Table of Contents

Advertisement

CHAPTER
FIRST START-UP

Procedure

01. Open the front plate.
02. Clean the device (see chapter "Cleaning").
03. Insert the desired material blank into the orbit (position acc. to notch) using the appropriate
04. The elaboration tools need to be placed into the tool magazine with the milling surface
facing down.
05. Check the power supply - main switch lights green.
06. Close the front plate.
07. Double-click on the desktop symbol "Zirkonzahn.Fräsen". The Zirkonzahn.Fräsen
software opens.
08.
09.
10.
tool magazine.
11. The calculated milling data are sent to the milling unit.
12. Start milling operation.
CAUTION:
13. Monitor the starting procedure. In the event of a malfunction of the suction unit or other
errors, abort the milling process immediately (press the emergency switch).
14. After completing the milling process, the spindle slides return to the starting position.
15. Take the milled workpiece out of the orbit and complete the work.
16. Clean the device.
46
ZIRKONZAHN – OPERATION AND MAINTENANCE M2 MILLING UNIT COMFORT LINE – VERSION: 19/05/2021

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the M2 MILLING UNIT COMFORT LINE and is the answer not in the manual?

Questions and answers

Table of Contents