CHAPTER
FIRST START-UP
NORMAL OPERATION WET MILLING
8
9
1o
11
40
Connect the blue hose of the Cleaning Bucket to the
"Liquid IN" connection on the rear of the milling unit.
Connect the drain hose of the Cleaning Bucket to the
the pipe by tightening the metal ring attached to the hose.
Remove the lid of the Cleaning Bucket with the
connections.
To do so, hold the lid of the Cleaning Bucket with one
hand, press the "PUSH" button on the front with the other
hand and open the lid at the same time.
Pour water and "Cooling Lubricant Plus Milling" in the
indicated mixing ratio into the Cleaning Bucket.