INSTALLER GUIDE
5.6 Fitting the closure plate.
The spigot opening in the closure plate has two 'flange' sections. Fold along the
perforated line of Flange 1. The dimensions of the closure plate will be as in figure 7.
The closure plate has an opening at the bottom for a central gas feed pipe. The
gap between the pipe and this opening should be sealed with tape after
connection. If a central feed pipe is not required the opening should be
completely sealed with tape.
Figure 7. Closure plate.
©
GDC Group Ltd. OCT 2016
Page 19