Housing Installation; Installing Er-Up/Gh Housing - Maico ER 60 E Mounting And Operating Instructions

Recess-mounted exhaust air system
Hide thumbs Also See for ER 60 E:
Table of Contents

Advertisement

11. Mounting preparations
2. Check shutter seal (visual check). This
must fit tightly.
3. Insert shutter [2] into exhaust socket as
shown in Fig. 6 until it reaches the stop.
Check position and ensure function.
4. Observe correct position of housing floor
seal in housing. If the installation position
is incorrect, the fan insert cannot fit tightly
and the unit draws in false air.

12. Housing installation

12.1 Installing ER-UP/GH housing

12.1.1 Impermissible connections on
ER-UP/GH housing
● A second room connection with an ER 60
fan insert (all models) is not permitted.
● Use of an ER fan is not permitted in the
bathroom or toilet room if other rooms in
the apartment are to be vented with the
same unit at the same time.
12.1.2 Mounting information for
ER-UP/GH housing
ER-UP/GH are equipped with a plastic
housing without fire protection equipment.
The ER-UP/GH housing may be installed in
the following installation positions:
● Mounting on wall: With upward, right-hand
or left-hand air outlet direction (exhaust
socket).
Installation with mounting support.
● Mounting on ceiling and suspended
ceiling: Installation with mounting support.
● Mounting on ceiling and non-suspended
ceiling: Mounting directly on the ceiling.
Suitable mounting material is to be supplied
by the customer.
The plastic shutter should be prepared
according to chapter 11.5.1 so that it
closes fully sealed in the installation
position.
18
The ER-UP/GH housing must be inserted
without any warping. Failure to do so will
mean that the fan insert cannot engage
correctly in the ER-UP/GH housing and the
degree of protection stated on the rating plate
is no longer ensured.
Break open one of the housing segments [S]
to use the second room connection set
ER-ZR or the extraction socket ER-AS.
A WC seat ventilation unit is connected to the
ER-UP/GH housing using the Ø 70 extraction
socket ER-AS.
The WC seat ventilation unit must
not be connected to the second room
connection socket or the Centro
exhaust air element.
Use expanded rubber ER-MO for acoustic
insulation of thin ceilings capable of
resonance ( accessories).
12.1.3 Important information about
plastering
● Max. compensable plaster overshoot 7 mm.
● Max. protruding housing edge 20 mm, can
be compensated for with spacing frame
DR 60/100.
● Installation at a depth of 50 to 100 mm can
be compensated for with the two-part wall
frame ER-MR.
● The gap remaining between the ER-UP/GH
housing and shaft must be fully sealed
with non-flammable materials resistant to
deformation so that incorrect air is not
drawn in.
We recommend keeping these
mounting and operating instructions
until final installation in the ER-UP/GH
housing.

Advertisement

Table of Contents
loading

Table of Contents