Maico ER 60 E Mounting And Operating Instructions page 20

Recess-mounted exhaust air system
Hide thumbs Also See for ER 60 E:
Table of Contents

Advertisement

11. Mounting preparations
4
18
Main duct (steel folded spiral-seams
duct)
19
Connection duct ER-UP/GH:
Flexible aluminium duct
21
Floor ceiling
22
Steel threaded rod / stair bolt
23
Duct attachment  Fig. 5
24
Duct clamp / clamping band
25
Ceiling compound
26
Shaft wall
27
Wall/board seal
28
Suspended ceiling
29
Steel screws or steel blind rivets
(3 of each)
30
Dowel:
30.1 Plastic dowel or anchor bolt
30.2 Metal expansion dowel
31
Retaining bolt with nut
32
Retaining bolt
33
Steel clamping band
Be sure to note the mounting
information in chapter 11.2.
16
Duct attachment with duct clamp, alterna-
tively duct attachment with clamping band
5
Maintain a maximum distance of 1.5 m
between the duct attachments [23].
4. Correctly attach main ventilation duct [18]
inside the shaft.
5. Fit ceiling compound for fire protection
systems. To do this, encase the ceiling
and pour in the material from above.

Advertisement

Table of Contents
loading

Table of Contents