Service work
7.8
Replacing the fuseholder
Removal:
►
Remove the heater insert (see Chapter 7.2).
►
Remove the cover plate (see Chapter 7.2).
►
Pull the spade connectors off the fuseholder.
►
Undo the nuts from the fuseholder using a 14 mm jaw spanner, and pull it forwards
off the front panel.
Refitting the fuseholder:
Refitting the fuseholder takes place in reverse order to removal:
►
Press the fuseholder into the cutout in the front panel, and tighten the nuts using a 14
mm jaw spanner.
NOTE
One side of the fuseholder is bevelled. This makes it possible for the fuseholder to
locate in only one position.
to power
switch
Figure 34: Fuseholder connections
►
Refix the cover plate (see Chapter 7.2).
►
Refit the heater insert (see Chapter 7.2).
Barkey GmbH & Co. KG - Gewerbestrasse 8 - 33818 Leopoldshoehe – Germany - Head Office: +49 (5202) 9801-0
Customer Service: +49 (5202) 9801-30 Fax: +49 (5202) 9801-99 - e-mail: info@barkey.de
►
Push the spade connectors onto the
fuseholder:
–
–
from mains
–
filter
–
Service manual
Barkey warming center III DTM
the cables from the mains filter to
the right-hand contact
the cables from the power switch
to the left-hand contact
the brown cables at the top
the blue cables at the bottom
33