Gambro sales office. The end of the Barkey autoline XPT 4R heater can be secured to the two slots on the lug when the heater is not in use. This avoids the risk that the heater interferes with the Prismaflex haemodialysis system scales or is damaged or contaminated by contact with the ground.
5.2.2 Installing the Barkey autoline XPT 4R heater support The support for the Barkey autoline XPT 4R heater is bolted to the right hand side of the haemodialysis system casing. The support has two holes for installation. Corresponding drilling points can be found on the right hand side of the Prismaflex haemodialysis system casing.
Barkey Prismacomfort 10 Warranty and disclaimer of liability Due to the fact that Barkey GmbH & Co. KG has absolutely no control over the quality of maintenance work which is not carried out by Barkey personnel, and that Barkey GmbH &...
Need help?
Do you have a question about the Prismacomfort and is the answer not in the manual?
Questions and answers