Chapter 1

Prepare for Installation

Inspect the Shipment

Before you begin installation, check your shipment and confirm it arrived complete and
undamaged.
1. Check the packaging for physical damage.
Document any damage found before opening in case of damage to equipment.
2. Inspect the order for completeness.
Check the box contents received against the packing list to ensure your order is received
complete.
If you discover a problem with the contents of the shipment, contact the Systems Group.
See
Help from ETC Technical Services on page 10

Unpack Panel

For best results, follow these instructions when unpacking the panel from the box.
1. Lay the box flat, top side up on a floor or flat horizontal surface. The top side of the box is
labeled for your convenience.
2. Lift and remove the box lid. A standard model Relay Panel Mains Feed ships from the
factory, pre-wired with low-voltage relay control. As you remove the Relay Panel from the
shipping carton, confirm the following items are included:
A door, wrapped separately but packaged with the panel. The door will appear as a
separate line item on the sales order but ships in the same box as the main panel. Check
that the door is the correct model as ordered.
The relay panel with interiors (relay compartment and breaker compartment) and
removable covers.
The quantity and type of relays and breakers ordered
DMX Preparation kit
This installation manual
Note:
Note:
panel may be awkward and heavy to remove from the packaging.
3. To lift the panel from the packaging, one person lifts from the top side of the enclosure,
indicated with an arrow on the panel interior. A second person lifts from the bottom side of
the panel.
4. Rest the panel on a floor or flat horizontal surface until the installation personnel are ready
to begin the installation procedure.
11
All accessory options and option cards are packaged separately.
It is recommended to perform the next step with at least two people as the
for contact information.