Power Up and Test

WARNING:
panels and the door have been installed before turning on the power to the
rack.
1. Turn off all branch circuit breakers and the main circuit breaker (if installed).
2. Turn on the power source to the panel.
3. Turn on the main circuit breaker (if installed).
4. Turn on the breaker in the panel that is feeding the control electronics. This breaker is
labeled "Control".
5. Verify that the Power Control Processor Mk2 display and LED indicator illuminate.
If the display does not illuminate, check the incoming power feed and terminations.
6. Turn on the remaining branch circuit breakers in the panel.
7. Verify each load can be controlled by the panel.
a. Press the Test button (
b. Set all levels to 100%.
If you have any difficulties installing your system, please contact Technical Services at the
office nearest you. See
Reference the Power Control Processor Mk2 Configuration Manual for operation instructions
and maintenance information. Documentation is available for free download on our website
etcconnect.com.
35
RISK OF DEATH BY ELECTRIC SHOCK! Make sure both front
) on the Power Control Processor Mk2 to access the Test Menu.
Help from ETC Technical Services on page 10
.
Relay Panel Mains Feed Installation Manual